post-image-2

Armand Energy enabled a photovoltaic park with a 511 KW capacity

03.06.2014 16:14, Publicat de

In June 2013, Armand energy and Dana Bulgaria EOOD enabled the WEST SEMPOWER photovoltaic park with a capacity of 51 KW. Situated in Olcea, Bihor County, the solar park functions at optimum parameters. Armand Energy its operation and maintenance.

Armand Energy has exclusively handled the general project of the park and executed a great share of the construction work. It now insures the realization of the sales process for the electrical energy produced and the obtained green certificates.